Active Construction All Active Construction en-us Sun, 31 Aug 2025 17:16:43 -0400 Copyright 511nj.org 1 US 322 westbound : Construction NJDOT - TOC South: Roadwork on US 322 Westbound near East of I-295 (Logan Twp), Continuous Tuesday August 5, 2025 06:00 AM thru Friday October 3, 2025 06:00 PM, right shoulder closed Sun, 31 Aug 2025 14:29:05 -0400 39.7737426757812 -75.3374633789062 NY 695 northbound : Construction NYSDOT - Region 3: Construction , roadwork on NY 695 northbound between NY 5 (Camillus) and END ROUTE; I-690 (Geddes) All lanes of 4 lanes open until 6:30 PM Sun, 31 Aug 2025 09:00:04 -0400 43.061758 -76.23565 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound at Exit 29S - I-481 South; Dewitt (Cicero) All lanes of 4 lanes open until 6:00 PM ; Alternating shoulder closures Sun, 31 Aug 2025 06:30:05 -0400 43.1373913183594 -76.1171886816406 NY 417 both directions : Construction NYSDOT - Region 6: Construction , bridge rehabilitation on NY 417 both directions Exit - US 15 (Erwin) to Exit - Addison Road; Ramp (Erwin) right shoulder of 1 lane closed until 6:00 PM shoulders closed Sun, 31 Aug 2025 06:01:05 -0400 42.1104201676492 -77.1599017354463 NY 22 both directions : Construction NYSDOT TMC - Albany: Construction , repaving on NY 22 both directions between Jerome Dr (White Creek) and SNUFFYS LN (Jackson) All lanes of 1 lane open until 6:00 PM alternating lane closures Sun, 31 Aug 2025 06:00:04 -0400 43.0326780132668 -73.3765681677722 NY 85 both directions : Construction NYSDOT TMC - Albany: Construction, roadwork on NY 85 both directions Blessing Road (Bethlehem) and Scotland Road (Bethlehem)1 1 Right lane of 3 lanes closed until 6:00 PM single left or right lane closures /full Circle Closures Sun, 31 Aug 2025 06:00:16 -0400 42.6495819021768 -73.8472318400584 I-90 - NYS Thruway both directions : Construction NYSTA - Statewide Ops.: road maintenance operations ,left lane closed on I-90 - NYS Thruway both directions from Before Exit 44 (I-90) - Canandaigua (Rte 332) to After Exit 45 (I-90) - Rochester - Victor (I-490) until 11:30 PM, 09/30/2025 [CARS CAD-252410262] Sat, 30 Aug 2025 23:46:32 -0400 42.995648 -77.364982 S CROUSE AVE northbound : Construction NYSDOT - Region 3: Construction , drainage improvements on S CROUSE AVE northbound between E FAYETTE ST (Syracuse) and E WATER ST (Syracuse) All lanes of 3 lanes open until 5:00 PM on September 12,2025 ; Alternating one-way traffic with flaggers Fri, 29 Aug 2025 09:51:05 -0400 43.0485288807845 -76.1364993509936 CANAL ST both directions : Construction NYSDOT - Region 3: Construction , roadwork on CANAL ST both directions between WALNUT AVE (Syracuse) and UNIVERSITY AVE (Syracuse) All lanes closed westbound; All lanes closed eastbound until 5:00 PM on November 28,2025 Fri, 29 Aug 2025 09:48:04 -0400 43.05114 -76.1320715956045 NY 19; Main Street both directions : Construction NYSDOT - Region 4: Construction , bridge rehabilitation on NY 19; Main Street both directions over Erie Canal (Sweden) All lanes closed until 5:00 PM follow posted detour Fri, 29 Aug 2025 09:00:05 -0400 43.2167035797022 -77.9381374000902 NY 12B both directions : Construction NYSDOT - Region 2: Construction, construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) until 5:30 P.M. on September 05, 2025 Motorists will encounter daily lane closures with flaggers in place. A long term lane shift on Route 12B near McDonalds for sidewalk work. A long term lane shift on College Street (Route 412) over Oriskany Creek is in place for sidewalk work. The detour will utilize Route 12b, Route 233 and Route 5 Fri, 29 Aug 2025 08:00:17 -0400 43.0481786417419 -75.3815084242297 NY 69 both directions : Construction NYSDOT - Region 2: Construction, bridge construction on NY 69 both directions under I-90 (Whitestown) until 6:00 P.M. on September 30, 2025 Motorists will encounter long term lane shift in both directions under the bridge Fri, 29 Aug 2025 07:39:56 -0400 43.1299127509732 -75.3008088140435 NY 28 both directions : Construction NYSDOT - Region 2: Construction, bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) until 6:00 P.M. Motorists will encounter possible lane closures/ lane shifts with flaggers in place for the I-90 bridge replacement Fri, 29 Aug 2025 06:00:09 -0400 43.0176476218537 -74.9935529126271 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction, construction on George Washington Bridge Upper Level westbound Upper Trans Manhattan Expressway (Manhattan) 1 Right lane of 3 lanes closed through November 2025 Thu, 28 Aug 2025 13:19:57 -0400 40.8486898874025 -73.9372566112686 NY 80 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 80 both directions between Smith Road (Springfield) and Public Landing Road; CR 29A (Springfield) 2 all lanes of 2 lanes blocked for culvert replacement between Smith Rd. & CR-29A (Public Landing Rd.) between 8/21/25 to 10/17/25 between 6:30am to 5:30pm. This work is weather dependent, and flag personnel will be present. This is a long-term closure to replace the culvert over Hayden Creek. Detour is NY-80 (Cooperstown)to NY-28 to US-20(Richfield Springs) back to NY-80. IR:8589090 D:265086 Thu, 21 Aug 2025 06:35:31 -0400 42.8279991149902 -74.8798980712891 NY 31 both directions : Construction NYSDOT - Region 3: Construction , bridge rehabilitation on NY 31 both directions between Carmer Rd (Elbridge) and Sweeney Pl (Elbridge) right shoulder of 1 lane closed until 3:30 PM on September 19,2025 Thu, 28 Aug 2025 11:19:02 -0400 43.0757937190928 -76.4809491700009 E WATER ST both directions : Construction NYSDOT - Region 3: Construction , drainage improvements on E WATER ST both directions between FORMAN AVE (Syracuse) and UNIVERSITY AVE (Syracuse) All lanes closed eastbound; All lanes of 3 lanes open westbound until 4:00 PM on November 30,2025 ; follow detour Thu, 28 Aug 2025 10:00:07 -0400 43.050348426544 -76.1398003130108 NY 5 both directions : Construction NYSDOT - Region 3: Construction , drainage improvements on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse) All lanes closed eastbound; All lanes of 2 lanes open westbound until 3:00 PM on November 30,2025 ; Alternating lane closures Thu, 28 Aug 2025 10:00:07 -0400 43.0507884845984 -76.1420478685352 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, emergency repairs on Taconic State Parkway northbound between W Stevens Avenue (Mount Pleasant) and Exit 2 - Broadway - NY 141 (Mount Pleasant) right lane closed to traffic until 11:59 P.M. on September 05, 2025 D265281/B5502029/32531909 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Wed, 27 Aug 2025 12:28:19 -0400 41.0972728367794 -73.7943035048422 NY 31 both directions : Construction NYSDOT - Region 3: Construction , roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road (Cicero) All lanes of 2 lanes open until 4:00 PM on October 01,2025 ; Alternating lane closures Wed, 27 Aug 2025 10:40:05 -0400 43.1765521677374 -76.0953007485111 I-690 eastbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 eastbound between Exit 16N and Exit 16S - NY 635 Thompson Road (Syracuse) and Exit 17 - Bridge Street (De Witt) 1 Left lane of 3 lanes closed until 3:00 PM on September 19,2025 Wed, 27 Aug 2025 10:11:07 -0400 43.05896 -76.088103 NY 119 westbound : Construction NYSDOT - Region 8: Construction, emergency repairs on NY 119 westbound under Knollwood Road - NY 100A (Greenburgh) right lane closed to traffic until 11:59 P.M. on September 26, 2025 DOT BM/B1036200/32528409 - 24/7 LANE CLOSURE until further notice - Plan travel accordingly; delays may exist Tue, 26 Aug 2025 08:54:35 -0400 41.045502478922 -73.8046301876874 NY 10 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 10 both directions between Stoner Lake Road (Arietta) and Powley Road (Arietta) until 5:00 P.M. Motorists will encounter lane closures in both directions with a temporary signal in place Tue, 26 Aug 2025 07:00:30 -0400 43.3574684957089 -74.5415301891675 US 6 both directions : Construction NYSDOT - Region 8: Construction, roadwork on US 6 both directions between Millington Road (Cortlandt) and Westbrook Drive (Cortlandt) 1 lane closed to traffic until 11:59 P.M. on November 26, 2025 D265424/32503609 - 24/7 LANE CLOSURE IN PLACE - Plan travel accordingly; delays may exist Mon, 25 Aug 2025 15:38:31 -0400 41.3025909732247 -73.8810351060112 NY 22 both directions : Construction NYSDOT TMC - Albany: Construction on NY 22 both directions at Spring Rd (Whitehall) 1 Right lane of 2 lanes closed northbound; All lanes open southbound northbound until 11:59 PM on August 28,2025 alternating lane closures Thu, 28 Aug 2025 18:16:47 -0400 43.6834256194659 -73.4241671238932 NY 28 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 28 both directions area of Turnpike Rd. (Meredeth) 1 alternate lanes of 2 lanes blocked for culvert replacement NY-28 between reference markers 1385 to 1388 near Turnpike Rd. from 8/25 to 9/5 between 6am & 5:30pm. This work is weather dependent and flag personnel are present. IR:8617090 D264780 Fri, 29 Aug 2025 16:01:03 -0400 42.3563847108604 -74.9373125872892 Cross County Parkway both directions : Construction NYSDOT - Region 8: Construction, bridge maintenance operations on Cross County Parkway both directions between Exit 6 - Bronx River Parkway (Mount Vernon) and Exit 8 - NY 22 - North Columbus Avenue (Mount Vernon) left lane and shoulder closure until 12:00 A.M. on September 06, 2025 D265316/NIGHT/B5501230/32522409 - This work is weather permitting. Plan travel accordingly; delays may exist Sun, 24 Aug 2025 00:00:00 -0400 40.9255353193516 -73.8283873199824 NY 440 southbound : Construction NYSDOT - Region 11: Construction on NY 440 southbound Exit ramp Arthur Kill Road (New York) 1 Right lane of 2 lanes closed until further notice Long Term - Construction Tue, 26 Aug 2025 18:00:24 -0400 40.560427959716 -74.1997483036048 US 9 southbound : Construction NYSDOT TMC - Albany: Construction , bridge work on US 9 southbound towards I-90 ramps (Albany) 1 Left lane of 2 lanes closed until 11:59 PM on September 05,2025 - Installation of scaffolding and containment for bridge painting and blasting Fri, 22 Aug 2025 15:18:03 -0400 42.672342 -73.747212 I-90 westbound : Construction NYSDOT TMC - Albany: Construction , bridge work on I-90 westbound Off-ramp Exit 6; US 9 (Albany) 1 Left lane of 2 lanes closed until 11:59 PM - Scaffolding and containment for bridge painting and blasting Fri, 22 Aug 2025 15:12:09 -0400 42.670215 -73.7449 NY 7 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 7 both directions between Butternut Road (Unadilla) and SR 991J (Otego) 1 alternate lanes of 2 lanes blocked for chip sealing to occur from 8/22 to 8/25 during the hours of 6:00 AM to 6:00 PM. This work is weather dependent with flagger personnel present. Started Open Reach. IR# 8599090 Mon, 25 Aug 2025 08:59:08 -0400 42.3289985656738 -75.3029022216797 Taconic State Parkway both directions : Construction NYSDOT - Region 8: Construction, road rehabilitation on Taconic State Parkway both directions between Exit 43 - NY 82 (East Fishkill) and Exit 54 - US 44 (Pleasant Valley) 1 lane closed to traffic until 6:00 P.M. on September 26, 2025 D265415/32480609 - LONG TERM LANE CLOSURE - Plan travel accordingly; delays may exist Thu, 21 Aug 2025 08:45:11 -0400 41.626580398293 -73.7765800175518 Taconic State Parkway southbound : Construction NYSDOT - Region 8: Construction, emergency repairs on Taconic State Parkway southbound between Exit 2 - Sprain Brook State Parkway (Mount Pleasant) and W Stevens Avenue (North Castle) right lane closed to traffic until 11:59 P.M. on October 31, 2025 DOT BM/B5502029/32521709 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist Wed, 20 Aug 2025 15:32:10 -0400 41.097198392738 -73.7943022063604 I-690 westbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse) right shoulder of 4 lanes closed until 3:00 PM on September 30,2025 Wed, 20 Aug 2025 11:43:03 -0400 43.052702 -76.124491 TOTMAN RD both directions : Construction NYSDOT - Region 3: Construction , bridge painting on TOTMAN RD both directions between SMITH RD (Cicero) and EASTMAN RD (Cicero) All lanes closed northbound; All lanes of 1 lane open southbound until 6:00 PM on September 02,2025 ; follow detour Mon, 18 Aug 2025 06:00:07 -0400 43.1377832582053 -76.0907507047941 VAN WYCK EXPY southbound : Construction NYSDOT - Region 11: Construction, construction on VAN WYCK EXPY service road southbound between 89TH AVE (New York) and 91ST AVE (New York) 1 Left lane of 3 lanes closed until further notice Long Term - Construction Wed, 13 Aug 2025 16:27:11 -0400 40.7014667550904 -73.8163156694614 I-81 northbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 25A - I-90 (Salina) 2 Left lanes of 4 lanes closed until 3:00 PM on October 04,2025 Tue, 12 Aug 2025 13:19:04 -0400 43.068303 -76.166698 I-481 northbound : Construction NYSDOT - Region 3: Construction , road widening on I-481 northbound between Exit 3E - NY 92; NY 5 (De Witt) and Exit 4 - I-690 (De Witt) 1 Left lane and shoulder of 3 lanes closed until 3:00 PM on September 15,2025 Mon, 11 Aug 2025 09:00:20 -0400 43.029513 -76.062005 I-481 southbound : Construction NYSDOT - Region 3: Construction , road widening on I-481 southbound between Exit 4 - I-690 (De Witt) and Exit 3E - NY 92; NY 5 (De Witt) 1 Left lane and shoulder of 2 lanes closed until 3:00 PM on September 15,2025 Mon, 11 Aug 2025 09:00:21 -0400 43.047344 -76.051469 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Exit 12 - Connector from CR 48 to NY 7 at I-88 (Exit 12) (Otego) and Exit 13 - NY 205 (Oneonta) 1 alternate lanes of 2 lanes blocked for bridge painting to occur from 8/11 through 10/31 during the hours of 7:00 AM to 5:30 PM. CR 48 over I-88 will be painted as part of project. With flaggers then temp. signals on CR-48 only. This work is weather dependent with no flagger personnel present. Overnight closures in place. Started Open Reach. IR# 8502090 D265473 Mon, 25 Aug 2025 06:36:34 -0400 42.380298614502 -75.1875991821289 NY 14 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 14 both directions NY 54 (Torrey) to NY 54 (Torrey) All lanes of 1 lane open until 5:30 PM on October 03,2025 Lane Shift Mon, 11 Aug 2025 07:00:05 -0400 42.6780437447553 -76.9586677775687 NY 17 [Sullivan] westbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Sullivan] westbound between Exit 95 (Rockland) and Exit 94 - Stewart Brook Road; NY 206 (Rockland) 1 alternate lanes of 2 lanes blocked for deck repair on BIN 1063421 SR-17WB Between Exits 95 & 94 from 8/11/25 to 9/5/25 during 7:30am to 1pm. This work is weather dependent, and no flag personnel are present. IR:8500090 Thu, 28 Aug 2025 13:40:59 -0400 41.9327011108398 -74.9173965454102 Atlantic City Expressway westbound : Construction South Jersey Transp. Auth.: Construction, construction on Atlantic City Expressway westbound between West of Exit 5 - US 9 (Egg Harbor Twp) and West of Exit 5 - US 9 (Pleasantville) right shoulder closed MOVE OVER FOR HIGHWAY WORKERS Fri, 08 Aug 2025 06:42:26 -0400 39.4058300950264 -74.5371985988697 NY 9D northbound : Construction NYSDOT - Region 8: Construction, tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) alternating traffic until 11:59 P.M. on September 25, 2025 D265238-202508112949/32312109 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist Thu, 07 Aug 2025 12:35:59 -0400 41.4412377311786 -73.9755173946684 NY 347 westbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on NY 347 westbound between Nicolls Road; CR 97 (Brookhaven) and Hallock Avenue (Smithtown) 1 Right lane of 3 lanes closed until further notice Thu, 07 Aug 2025 09:28:59 -0400 40.8831055 -73.1068105 US 9W both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) All lanes of 2 lanes open until 5:00 PM on July 03,2026 one lane open in both directions, NB lane shift in place Wed, 06 Aug 2025 09:46:05 -0400 42.5340517856205 -73.8058262254228 I-81 northbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 27- Syracuse Airport (Salina) 1 Left lane of 3 lanes closed until 6:00 AM on November 30,2025 Fri, 01 Aug 2025 18:00:07 -0400 43.068303 -76.166698 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound between Exit 27- Syracuse Airport (Salina) and Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) 1 Left lane of 3 lanes closed until 6:00 AM on November 30,2025 Fri, 01 Aug 2025 18:00:08 -0400 43.113439 -76.142598 I-481 northbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 northbound between Exit 4 - I-690 (De Witt) and Exit 5E - Kirkville Road; CR 53 (De Witt) All lanes of 2 lanes open until 3:00 PM on October 10,2025 Fri, 01 Aug 2025 10:43:06 -0400 43.05170180557 -76.0498828914155 NY 167 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 167 both directions between West State Street; NY 29; END ROUTE; East State Street (Manheim) and Gibson Street (Dolgeville) all lanes closed until 5:00 P.M. on August 30, 2025 Motorists will encounter a full road closure with a signed detour in place Fri, 01 Aug 2025 07:56:13 -0400 43.1040279997028 -74.7701709089582 NY 224 both directions : Construction NYSDOT - Region 6: Construction , bridge work on NY 224 both directions North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) to North Catherine Street; NY 14; Montour Falls; END ROUTE NY 224 (Montour) All lanes of 1 lane open until 5:30 PM 2 lanes reduced to 1 Fri, 01 Aug 2025 07:00:17 -0400 42.34319638507 -76.8272427059288 NY 274 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 274 both directions between Fraser Road (Holland Patent ) and Williams Road (Oneida) until 6:00 P.M. Fri, 01 Aug 2025 05:30:21 -0400 43.2947982715304 -75.2671427615046 NY 22 southbound : Construction NYSDOT TMC - Albany: Construction , bridge replacement on NY 22 southbound between CR 71 and Cold Spring Ln (White Creek) All lanes of 1 lane open until 11:59 PM on November 30,2025 alternating lane closures Thu, 31 Jul 2025 00:00:05 -0400 43.012977527242 -73.3782328280623 NY 22 southbound : Construction NYSDOT TMC - Albany: Construction , culvert repairs on NY 22 southbound between Highland Rd and Farrell Rd (Willsboro) All lanes of 1 lane open until 11:59 PM on August 22,2025 alternating lane closures Thu, 31 Jul 2025 00:00:05 -0400 44.4019203990995 -73.4537596351357 NY 17 [Broome] eastbound : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Broome] eastbound over Choconut Creek (Vestal) 1 alternate lanes of 2 lanes blocked for bridge repairs to occur from 7/29 through 8/29 during the hours of 6:00 AM to 4:00 PM. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 8385090 D265376 Tue, 29 Jul 2025 06:40:52 -0400 42.0855166491977 -76.0630085952406 I-481 southbound : Construction NYSDOT - Region 3: Construction , reconstruction on I-481 southbound ramp to I-81 NB (Syracuse) All lanes closed until 6:00 AM on September 30,2025 Mon, 28 Jul 2025 21:00:05 -0400 43.0079193324807 -76.1305331707167 I-690 westbound : Construction NYSDOT - Region 3: Construction , installation of sign structure on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse) 1 Right lane and shoulder of 3 lanes closed until 3:00 PM on February 02,2026 Mon, 28 Jul 2025 10:39:06 -0400 43.058837 -76.099037 Corbin Street both directions : Construction Port Authority NY/NJ: Construction, construction on Corbin Street both directions Kellogg Street (Newark) to Outer Port Street 1 Right lane of 3 lanes closed September 2025 Mon, 28 Jul 2025 08:40:30 -0400 40.7029624496184 -74.1514398425719 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound at Exit 29N - NY 481; North Syracuse; Oswego (Cicero) right shoulder of 3 lanes closed until 6:00 PM ; Alternating shoulder closures Mon, 28 Jul 2025 07:00:05 -0400 43.1420079390913 -76.1119110803027 US 20 eastbound : Construction NYSDOT - Region 3: Construction , roadwork on US 20 eastbound between Columbus St (Aurelius) and Washington St (Auburn) 1 Left lane of 2 lanes closed until 4:00 PM on September 01,2025 Fri, 25 Jul 2025 08:00:05 -0400 42.930775 -76.584965 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Alder Brook Road ( Morehouse) and Morehouse Lake Road (Hamilton) until 5:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Fri, 25 Jul 2025 07:01:14 -0400 43.379863109796 -74.6637756340183 NY 10 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 10 both directions between Shaker Road (Arietta) and Powley Road (Arietta) until 5:00 P.M. Motorists will encounter lane closures in both directions with a temporary signal in place Fri, 25 Jul 2025 07:01:12 -0400 43.3574684957089 -74.5415301891675 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound between South Bay Road; CR 208 (Cicero) and Exit 29S - I-481 South; Dewitt (Cicero) All lanes of 3 lanes open until 3:00 PM on December 31,2025 Lane Shift Fri, 25 Jul 2025 06:00:17 -0400 43.149487 -76.110244 I-481 northbound : Construction NYSDOT - Region 3: Construction , reconstruction on I-481 northbound at Exit 9N; I-81 N, for a Lane Shift (Cicero) All lanes of 1 lane open until 3:00 PM on December 31,2025 Thu, 24 Jul 2025 06:00:14 -0400 43.1406282966233 -76.1036614272025 NY 30 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 30 both directions over I-88 (Schoharie) 1 alternate lanes of 2 lanes blocked for bridge repair to occur from 7/22 through 9/12 during the hours of 7:00 AM to 3:30 PM. This work is weather dependent with no flagger personnel present. All SR 30 traffic through work zone controlled via temporary signal. Started Open Reach. IR# 8334090 Fri, 29 Aug 2025 14:44:02 -0400 42.7136001586914 -74.2762985229492 NY 9N northbound : Construction NYSDOT TMC - Albany: Construction , bridge replacement on NY 9N northbound at Style Brook Rd (Jay) All lanes of 1 lane open until 5:30 PM on September 05,2025 alternating lane closures Tue, 22 Jul 2025 07:00:10 -0400 44.2980916666508 -73.7859047618925 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound ramp from Bear Street; NY 298 (Syracuse) All lanes closed until 3:30 PM on October 31,2025 ; follow detour Mon, 21 Jul 2025 11:55:06 -0400 43.0657879806094 -76.1633330227763 I-81 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-81 both directions between Exit 6 S-N- US 11; Ramp (Chenango) and Upper Front Street; US 11 (Chenango) 1 alternate lanes of 2 lanes blocked for bridge repair to occur from 7/21 through 9/8 during the hours of 7:00 AM to 2:00 PM. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 8318090 Sun, 10 Aug 2025 19:31:26 -0400 42.1501998901367 -75.8964996337891 Spencer St. both directions : Construction NYSDOT - Region 3: Construction , bridge work on Spencer St. both directions between N. State St. (Syracuse) and N. Clinton St. (Syracuse) All lanes closed until 3:30 PM on October 31,2025 Detour in place. Mon, 14 Jul 2025 11:04:04 -0400 43.0612283778067 -76.1554465127729 NY 220 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 220 both directions between Shipton Rd. (Smithville) and German Hollow Rd. (Smithville) 1 alternate lanes of 2 lanes blocked Bridge Painting Contract BIN 1041680 Rte. 220 over Strong Brook between Shipton Road and German Hollow Road. Between 7/14/25 to 10/30/25 from 7am to 5:30pm. Near RM 220 9201 1017. with temporary traffic signals to be set up. This work is weather dependent & flaggers will be present until temp signal set up. IR:8253091 D: 265473 Fri, 15 Aug 2025 15:32:28 -0400 42.4170489967655 -75.8011065228187 NY 26 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 26 both directions between Watkins Rd (Pitcher) and Bauman Rd. (Pitcher) 1 alternate lanes of 2 lanes blocked River Bridge Painting Contract BIN 1018720 Rte. 26 over Otselic River between Watkins Road and Bauman Road. Near RM 26 9203 10 37. From 7/14/25 to 10/31/25 between 7am to 5:30pm. Initial short term daily lane closure Then Long-term Lane closure with temporary traffic signals, This work is weather dependent and flag personal will be present until temp signal installed. IR:8252091 D: 265473 Wed, 20 Aug 2025 14:18:46 -0400 42.609789136628 -75.8296132352371 NY 204 both directions : Construction NYSDOT - Region 4: Construction , road rehabilitation on NY 204 both directions between Deep Rock Road (Gates) and Buell Road; Airport Road (Gates) All lanes closed and detoured until 7:00 PM on September 29,2025 ROAD CLOSED, follow posted detours. Free taxi service for pedestrian detour, info at detour Mon, 14 Jul 2025 07:00:08 -0400 43.1306813817706 -77.6793340026153 I-481 northbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 northbound between Northern Boulevard; CR 82 (Cicero) and Exit 1A (Old Exit 9S); I-81 S (Cicero) All lanes of 2 lanes open until 3:00 PM on December 31,2025 Fri, 11 Jul 2025 06:00:25 -0400 43.1382961374098 -76.0905143876482 I-81 southbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) All lanes of 4 lanes open until 11:59 PM on October 31,2026 ; Alternating lane closures Fri, 11 Jul 2025 00:00:06 -0400 43.047668293587 -76.1426372866984 I-690 westbound : Construction NYSDOT - Region 3: Construction , roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse) 1 Left lane of 3 lanes closed until 3:00 PM on February 01,2026 Thu, 10 Jul 2025 15:00:23 -0400 43.052292 -76.125858 NY 7 westbound : Construction NYSDOT TMC - Albany: Construction , bridge replacement on NY 7 westbound over I-87 (Colonie) 1 Right lane of 2 lanes closed until 6:00 AM on September 19,2025 Mon, 07 Jul 2025 20:00:11 -0400 42.763249 -73.762118 REYNOLDS AVE both directions : Construction NYSDOT - Region 6: Construction on REYNOLDS AVE both directions CR-41 (Corning) to WINFIELD ST (Corning) All lanes closed until 11:59 PM road closed Tue, 08 Jul 2025 01:17:22 -0400 42.1637098214828 -77.0702306197383 CR-125 both directions : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on CR-125 both directions between WEAVER RD (Clayton) and COUNTY ROUTE 54 (Clayton) All lanes closed until 5:00 PM on November 03,2025 Morris Tract Road over Horse Creek Bridge Closed to all traffic. Follow Detour along Van Alstyne Road and County Route 54 Mon, 07 Jul 2025 08:00:07 -0400 44.0889435450621 -76.0493735430967 I-481 southbound : Construction NYSDOT - Region 3: Construction , bridge work on I-481 southbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 4 - I-690 (De Witt) All lanes of 3 lanes open until 7:00 PM on December 31,2025 ; Alternating left and right lane and shoulder closures Sun, 06 Jul 2025 14:58:05 -0400 43.0788953577289 -76.0536879910796 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 16 - US 11; Nedrow; Onondaga Nation (Onondaga) All lanes of 3 lanes open until 3:00 PM on December 31,2025 ; Alternating lane closures Sun, 06 Jul 2025 14:53:06 -0400 43.0199654196533 -76.1405422028076 I-481 northbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 northbound ramp to Exit 9S; I-81 S (Cicero) All lanes closed until 3:00 PM ; follow detour Sun, 06 Jul 2025 06:00:06 -0400 43.141093 -76.106904 I-81 southbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 southbound between Exit 29S - I-481 South; Dewitt (Cicero) and East Taft Road; CR 19 (North Syracuse) 1 Left lane of 2 lanes closed until 6:00 PM Sun, 06 Jul 2025 06:00:05 -0400 43.140206 -76.114204 NY 417 westbound : Construction NYSDOT - Region 6: Construction , bridge work on NY 417 westbound Town of Erwin; Town of Addison Line (Addison) to Town of Erwin; Town of Addison Line (Addison) right shoulder of 1 lane closed until 11:45 PM on November 01,2025 Shoulder Closure Wed, 02 Jul 2025 10:17:04 -0400 42.114540581911 -77.18119833166 Van Wyck Expressway northbound : Construction Port Authority NY/NJ: Construction on Van Wyck Expressway northbound ramp to North Service Road (New York) All lanes closed until 11:59 PM on September 03,2025 Sat, 05 Jul 2025 09:05:38 -0400 40.657544 -73.805959 NY 126 westbound : Construction NYSDOT - Region 7: Construction , construction on NY 126 westbound Town of New Bremen; Village of Croghan (New Bremen) to Town of New Bremen; Village of Croghan (New Bremen) All lanes closed until 5:00 PM on September 17,2025 Culvert Replacement at NY 126 over Tributary to Black Creek. Detour Route available along NY Routes 126, 410, 26 and 812 Mon, 30 Jun 2025 07:00:13 -0400 43.8894137234091 -75.4027849508917 NY 8 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 8 both directions between Griffen Road ( Wells) and Teachout Road (Wells) until 6:00 P.M. Fri, 27 Jun 2025 06:00:40 -0400 43.4603615850682 -74.2278188257434 NY 3 both directions : Construction NYSDOT - Region 7: Construction , construction on NY 3 both directions (Plattsburgh) All lanes closed until 5:00 PM Road closed to all traffic at NY 3 over Kelly Brook for culvert replacement. Follow Detour Route along Trudeau Road, NY 374 and Church Road. Thu, 26 Jun 2025 07:00:04 -0400 44.6958811254016 -73.6439382562477 US 9W both directions : Construction NYSDOT - Region 8: Construction, drainage improvements on US 9W both directions between NY 218 (Highlands) and Quaker Avenue (Cornwall) until 11:59 P.M. on August 31, 2025 D265262/32282409 - 1 LANE CLOSED 24/7 - Plan travel accordingly; delays may exist Wed, 25 Jun 2025 16:35:58 -0400 41.4217259264602 -74.0070927143097 NY 199 both directions : Construction NYSDOT - Region 8: Construction, culvert repairs on NY 199 both directions between Schultz Hill Road (Pine Plains) and Chase Road (Pine Plains) all lanes closed and detoured until 11:59 P.M. on August 31, 2025 D265226/32405209 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist Mon, 23 Jun 2025 00:00:58 -0400 41.9788923754502 -73.6157075914579 NY 5S both directions : Construction NYSDOT - Region 2: Construction, bridge construction on NY 5S both directions between Shrine Road (Glen) and Dufel Road (Glen) until 6:00 P.M. on August 30, 2025 Motorists will encounter lane and closures in both directions with flaggers in place Tue, 05 Aug 2025 11:07:19 -0400 42.9309737071676 -74.2884422227187 NY 29 both directions : Construction NYSDOT - Region 2: Construction, guard rail repairs on NY 29 both directions between NY 30 Junction Vail Mills (Mayfield) and Saratoga; Fulton County Line (Broadalbin) until 6:00 P.M. Motorists will encounter lane closures in both directions with flaggers in place Wed, 18 Jun 2025 07:00:24 -0400 43.0474014282227 -74.2169036865234 NY 80 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 80 both directions between Smith Road (Springfield) and Public Landing Road; CR 29A (Springfield) 1 alternate lanes of 2 lanes blocked For drilling & installing piles for lag wall, temp. driveways, prepping water diversion on SR-80 between Smith Rd. & Public landing Rd. from 6/16 to 11/30 during 6:30am to 5pm. This work is weather dependent and flag personnel are present. IR:7972090 D:265086 Wed, 20 Aug 2025 14:29:13 -0400 42.8279991149902 -74.8798980712891 NY 23 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 23 both directions between NY 8 South New Berlin (New Berlin) and CR 18 (Morris) 1 alternate lanes of 2 lanes blocked for bridge replacement SR-23 over the Unadilla River starting 6/17/25 to 1/2/26 from 6am to 5pm. A one-lane on-site detour will be activated for SR-23 East & West bound traffic for both directions between SR-8 & CR-18. Traffic will be controlled utilizing Temporary Traffic Signals. This work is weather dependent, and no flag personnel are present. IR:7969090 D:265265 Tue, 17 Jun 2025 06:27:57 -0400 42.529598236084 -75.3850021362305 NY 237 both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 237 both directions area of Main Street; NY 7; Maple Street (Oneonta) all lanes closure for the reconstruction of intersection and roundabout installation to occur from 6/2 through 9/5 during the hours of 7:00 AM to 6:00 PM. SR 23 NB traffic to SR 7 EB and SR 7 EB to SR 23 SB remain open with all other traffic detoured. This closure remains in place for entirety of work including off hours and overnight. This work is weather dependent with no flagger personnel present. Started Open Reach. IR# 7903090 D265569 Wed, 11 Jun 2025 08:06:18 -0400 42.456901550293 -75.0584030151367 NY 48 both directions : Construction NYSDOT - Region 3: Construction , reconstruction on NY 48 both directions between Murray St and W Utica St (Oswego) 1 Left lane of 2 lanes closed until 5:00 PM on October 31,2025 Wed, 11 Jun 2025 07:00:09 -0400 43.4472251585019 -76.5046866152278 FINEVIEW PL both directions : Construction NYSDOT - Region 3: Construction , roadwork on FINEVIEW PL both directions between RENWICK AVE (Syracuse) and STANDART ST (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent Road Closure Wed, 11 Jun 2025 00:00:07 -0400 43.0371160398121 -76.1415755230853 VAN WYCK EXPY southbound : Construction NYSDOT - Region 11: Construction on VAN WYCK EXPY service road southbound between 105TH AVE (New York) and 107TH AVE (New York) 1 Left lane of 3 lanes closed until further notice Long Term - Construction Wed, 13 Aug 2025 16:57:11 -0400 40.6907881837233 -73.8103679556409 I-88 eastbound : Roadwork NYSDOT - Region 9: Roadwork on I-88 eastbound between Brooker Hollow Road (Worcester) and Exit 20 - NY 7; NY 10; Richmondville (Richmondville) 1 alternate lanes blocked For bridge joint repairs and resurfacing I-88EB between Otsego line & Exit 20, from 6/9/25 to 11/1/25 between 6am & 6pm. This work is not weather dependent and no flaggers present. IR: 7874090 D:265446 Mon, 09 Jun 2025 06:50:06 -0400 42.6287994384766 -74.6602020263672 RENWICK AVE both directions : Construction NYSDOT - Region 3: Construction , roadwork on RENWICK AVE both directions between VAN BUREN ST (Syracuse) and E CASTLE ST at S McBride St (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent road closure Wed, 04 Jun 2025 08:43:05 -0400 43.0375081304917 -76.14151 E RAYNOR AVE both directions : Construction NYSDOT - Region 3: Construction , roadwork on E RAYNOR AVE both directions between FINEVIEW PL (Syracuse) and HENRY ST (Syracuse) All lanes closed until 11:59 PM on July 31,2028 Permanent road closure Wed, 04 Jun 2025 08:03:07 -0400 43.0357909089078 -76.1416191112315 NY 28 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 28 both directions area of (Hamilton) until 6:00 P.M. on November 30, 2025 Wed, 04 Jun 2025 06:22:20 -0400 43.8070651663977 -74.6099564593801 REDMAN RD both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on REDMAN RD both directions between JACOBS RD (Hamlin) and CR-279, MORTON RD (Hamlin) All lanes closed and detoured until 5:00 PM on October 01,2025 ROAD CLOSED FOR BRIDGE REPLACMENT, LOCAL TRAFFIC ONLY, FOLLOW POSTED DETOUR Tue, 27 May 2025 09:00:05 -0400 43.3429240619592 -77.96526 NY 29 both directions : Construction NYSDOT - Region 2: Construction, construction on NY 29 both directions between Valley Road (Johnstown) and Church Road (Johnstown) all lanes closed until 6:00 P.M. on September 11, 2025 Motorists will encounter a full road closure with a signed detour in place. The detour will be Route 29 to Route 10A to Route 10 back to Route 29 Tue, 27 May 2025 06:00:36 -0400 43.0581226980207 -74.5032300762181 NY 98 both directions : Construction NYSDOT - Region 4: Construction on NY 98 both directions at Rte. 98 Canal Lift Bridge (Albion) All lanes closed Monday September 15th, 2025 05:00 PM Detour(s) will be posted Sat, 30 Aug 2025 12:46:58 -0400 43.2490675782485 -78.1936652559225 Taconic State Parkway northbound : Construction NYSDOT - Region 8: Construction, roadwork on Taconic State Parkway northbound ramp from NY 134 (Yorktown) right shoulder closure until 11:59 P.M. on September 02, 2025 D264582/B5502190/32288809 - Use caution when entering roadway; 24/7 shoulder closure on ramp Wed, 21 May 2025 20:00:21 -0400 41.2164680388969 -73.8099504200306 Atlantic City Expressway eastbound : Roadwork South Jersey Transp. Auth.: Roadwork, roadwork on Atlantic City Expressway eastbound East of Pleasantville Toll Plaza (Pleasantville) right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS Mon, 19 May 2025 06:55:54 -0400 39.391240296195 -74.5100804941141 George Washington Bridge westbound : Construction Port Authority NY/NJ: Construction on George Washington Bridge Upper Level westbound ramp from West 179th Street (New York) All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited. Wed, 09 Jul 2025 18:17:11 -0400 40.8493802929073 -73.9396241842173 NY 54A both directions : Construction NYSDOT - Region 6: Construction , milling on NY 54A both directions CR 88 (Urbana) to Town of Pulteney; Town of Urbana Line (Pulteney) All lanes of 1 lane open until 3:30 PM Single lane with flaggers Wed, 14 May 2025 12:08:04 -0400 42.4095277771257 -77.2242444311884 CR-194, Atteridge Rd. both directions : Construction NYSDOT - Region 4: Construction , culvert repairs on CR-194, Atteridge Rd. both directions between CR-159, Savage Rd (Riga) and CR-194 at CR-131, Davis Rd (Riga) All lanes closed until 5:00 PM on September 09,2025 Follow posted detour Mon, 12 May 2025 09:00:15 -0400 43.0983424725152 -77.835414914853 Grandview Ave both directions : Construction NYSDOT - Region 2: Construction, construction on Grandview Ave both directions at Hillcrest Ave (Frankfort) until 6:00 P.M. on November 15, 2025 Local traffic only. No trucks Mon, 12 May 2025 08:13:13 -0400 43.0395781163687 -75.0776046957702 I-81 northbound : Construction NYSDOT - Region 3: Construction , roadwork on I-81 northbound between Exit 29S - I-481 South; Dewitt (Cicero) and South Bay Road; CR 208 (Cicero) All lanes of 3 lanes open until 3:00 PM on December 31,2025 Lane shift Mon, 12 May 2025 07:00:08 -0400 43.137334 -76.116896 NY 3 both directions : Construction NYSDOT - Region 7: Construction , longterm construction on NY 3 both directions (Piercefield) to COUNTY ROUTE 62 (Piercefield) All lanes of 1 lane open eastbound; All lanes closed westbound until 5:00 PM on November 01,2025 Single Narrow Travel Lane maintained by temporary traffic signals Thu, 08 May 2025 17:43:06 -0400 44.2417777477583 -74.5868466670589 NY 10 both directions : Construction NYSDOT - Region 2: Construction, culvert repairs on NY 10 both directions between Shaker Road (Arietta) and Powley Road (Arietta) until 5:00 P.M. Motorists will encounter lane closures in both directions with a temporary signal in place Fri, 02 May 2025 07:00:07 -0400 43.3574684957089 -74.5415301891675 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Main Street (Whitney Point) and Keibel Road (Whitney Point) 1 alternate lanes of 2 lanes blocked at various times for bridge reconstruction, curbing, drainage work to occur from 4/21 through 7/31/2026. Two lane, two way traffic will be maintained between Main Street and Keibel Road 24 hours/day. This work is weather dependent with flaggger personnel present. Started Open Reach. IR# 7461090 D264920 Tue, 05 Aug 2025 07:27:41 -0400 42.3359817350312 -75.9737122414941 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , bridge replacement on I-87 Northway northbound Off-ramp Exit 32 -Garvey Mill Road (Lewis) All lanes closed until 4:00 PM on December 05,2025 Mon, 21 Apr 2025 08:00:05 -0400 44.281811 -73.530484 BRIDGE ST eastbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes of 1 lane open until 5:00 PM on November 01,2025 Two-Way Traffic maintained on narrow single lane on bridge controlled by traffic signals Mon, 21 Apr 2025 07:00:06 -0400 43.9743621931654 -75.6148611815249 I-87 Northway northbound : Construction NYSDOT TMC - Albany: Construction , roadwork on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) All lanes of 2 lanes open until 11:59 PM Starting on 4/21/25, border crossing will be restricted to trailers over 16'4" in height, 8'5" in width and over 53' in length. Mon, 21 Apr 2025 00:00:07 -0400 45.008807 -73.452067 I-86 eastbound : Construction NITTEC: Construction , culvert repairs on I-86 eastbound Exit 26 - NY 16 Connector (Olean) to Exit 27 - NY 16 (Hinsdale) 1 Left lane of 2 lanes closed until 11:59 PM on May 30,2025 Tue, 15 Apr 2025 15:23:04 -0400 42.100083 -78.431821 Atlantic City Expressway eastbound : Construction South Jersey Transp. Auth.: Construction, construction on Atlantic City Expressway eastbound East of Exit 7 - Garden State Pkwy (Egg Harbor Twp) to West of Exit 5 - US 9 (Pleasantville) 1 Right lane and shoulder of 3 lanes closed MOVE OVER FOR HIGHWAY WORKERS Tue, 15 Apr 2025 07:47:57 -0400 39.409259572851 -74.5452205875936 I-81 northbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 northbound between Exit 25A - I-90 (Salina) and Exit 26 - US 11; Mattydale (Salina) 1 Right lane of 4 lanes closed until 3:00 PM on December 31,2025 Tue, 15 Apr 2025 06:17:05 -0400 43.093909452723 -76.1629143026372 I-87 Northway southbound : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on I-87 Northway southbound ramp to Exit 7; NY 7 (Colonie) 1 Left lane of 2 lanes closed until 11:59 PM on September 30,2025 Mon, 14 Apr 2025 10:18:05 -0400 42.762542 -73.763115 US 11 both directions : Roadwork NYSDOT - Region 9: Roadwork on US 11 both directions between Century Drive (Binghamton) and Page Road (Binghamton) 2 north of 4 lanes blocked for wall replacement to occur fom 4/14 through 11/15 during the hours of 7:00 AM to3:00 PM. This work is weather dependent with flagger personnel present. All NB traffic will be shifted to SB with one lane in each direction utilizing the south lanes. Started Open Reach. IR# 7418090 D265276 Mon, 14 Apr 2025 07:59:03 -0400 42.1031398779866 -75.865037177234 Southern State Parkway westbound : Roadwork NYSDOT - Region 10: Roadwork, roadwork on Southern State Parkway westbound Exit ramp Exit 15 - North Corona Avenue (Hempstead) All lanes closed until further notice Sat, 12 Apr 2025 09:59:46 -0400 40.6820463646154 -73.6920524736871 NY 22 both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on NY 22 both directions between Cold Spring Lane and CR 71 (White Creek) and Gilbert Street; NY 313 (White Creek) All lanes of 1 lane open until 5:00 PM on November 10,2025 Alternating one way traffic Wed, 09 Apr 2025 07:00:16 -0400 43.0047171731424 -73.3767883891918 NY 10 northbound : Roadwork NYSDOT - Region 9: Roadwork on NY 10 northbound area of Elk Creek Rd. (Delhi) northbound all lanes blocked for bridge replacement on SR-10NB at Elk Creek Rd. BIB 1007770 during the hours of 7:00am to 5:30pm 4/7/25 to 10/10/25. Onsite detour and temporary bridge will be in place to allow a single lane of traffic with temporary signals. The detour will have 11??? lanes w/ a 17??? max width and have temporary concrete barriers in place. This work is weather dependent and flag personnel will not be present. IR: 737090 D:265339 Mon, 09 Jun 2025 07:58:08 -0400 42.3002350968365 -74.8946429670142 NY 26 northbound : Construction NYSDOT - Region 7: Construction , bridge rehabilitation on NY 26 northbound Town of Martinsburg; Town of Lowville (Martinsburg) to Town of Martinsburg; Town of Lowville (Martinsburg) All lanes closed until 11:59 PM on November 01,2025 NY Route 26 over Roaring Brook Bridge Closed to All Traffic. Motorists advised to use Posted Detour Route along NY Routes 26, 12D and 12 Mon, 07 Apr 2025 07:00:10 -0400 43.7334001960982 -75.4693143565648 I-490 eastbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 eastbound between Exit 26 - NY 31 (Perinton) and Exit 28 - I-490; Ramp (Perinton) 1 Left lane of 2 lanes closed until 5:00 PM on October 31,2025 Traffic will cross over to the WB side after exit 26 and will cross back over to the EB side after exit 27. There is no access to the EXIT 27 off-ramp. Mon, 07 Apr 2025 07:00:11 -0400 43.07748 -77.48448 I-481 northbound : Construction NYSDOT - Region 3: Construction , bridge replacement on I-481 northbound between Exit 8 - Northern Boulevard (Cicero) and Exit 9N; I-81 N (Cicero) All lanes of 2 lanes open until 11:59 PM on October 31,2025 Mon, 07 Apr 2025 00:00:04 -0400 43.135228 -76.077789 NY 201 northbound : Roadwork NYSDOT - Region 9: Roadwork on NY 201 northbound area of Town of Union; Town of Vestal Line (Union) 1 1 lane may be of 2 lanes blocked Soundwall removal and replacement on 201 NB at Riverside Drive Exit from 4/1/25 to 8/18/25. Day work is from 7am to 5pm with no lane closures, night work begins 7/24 to 9/18, between 9pm & 8am with the right lane blocked during these hours. Shoulder will be closed with a pedestrian detour in place. work is weather dependent. No flaggers will be present, D#265353 Open Reach Started IR# 7341090 Mon, 18 Aug 2025 15:30:16 -0400 42.103401184082 -75.9692001342773 I-490 westbound : Construction NYSDOT - Region 4: Construction , bridge replacement on I-490 westbound between Exit 28 - I-490; Ramp (Perinton) and Exit 26 - NY 31 (Perinton) 1 Left lane of 2 lanes closed until 5:00 PM on October 31,2025 Tue, 01 Apr 2025 07:00:10 -0400 43.0455238653937 -77.4629282921857 New Jersey Turnpike - Eastern Spur southbound : Long term road construction NJ Turnpike Auth.: Long term road construction on New Jersey Turnpike - Eastern Spur southbound South of Northern Mixing Bowl (Ridgefield) to North of Interchange 17E - NJ 3/Lincoln Tunnel (Secaucus) 1 Right lane of 3 lanes shift Mon, 31 Mar 2025 18:08:59 -0400 40.8151227837493 -74.0285478258704 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Exit 18 - Route 7 Schenevus (Maryland) and Exit 19 - Hollenbeck Road to Route 7 Worcester (Worcester) 1 alternate lanes of 2 lanes blocked for crack and seat pavement rehab to occur from 3/31 through 11/30 during the hours of 6:00 AM to 6:00 PM. Lanes closures will remain in place overnight for duration of work. This work is weather dependent with no flagger personnel present. On 5/5 WB traffic will be moved to EB side from Exit 19 to 18 rhen returned. Exit 19 on ramp detoured to Exit 18. Started Open Reach. IR# 7333090 D265154 Mon, 05 May 2025 09:53:39 -0400 42.5420989990234 -74.8197021484375 NY 96 Bushnell Basin : Construction NYSDOT - Region 4: Construction , longterm construction on NY 96 Bushnell Basin ramp ramp to I-490 WB (Perinton) to I-490 WB (Perinton) All lanes closed until 5:00 PM on October 31,2025 Mon, 31 Mar 2025 07:00:04 -0400 43.058212 -77.473265 I-90 both directions : Construction NYSDOT TMC - Albany: Construction , bridge rehabilitation on I-90 both directions at Van Hoesen Rd Overpass (Schodack) 1 Right lane of 2 lanes closed until 11:59 PM on November 15,2025 Mon, 31 Mar 2025 00:00:04 -0400 42.5197034708916 -73.6888671581318 CORPORATE WOODS BLVD both directions : Construction NYSDOT TMC - Albany: Construction , bridge replacement on CORPORATE WOODS BLVD both directions on Corporate Woods Blvd Bridge (Colonie) All lanes of 3 lanes open until 11:59 PM on November 15,2025 single lane closures Wed, 26 Mar 2025 10:49:05 -0400 42.6838898400568 -73.77254483426 NY 52 both directions : Construction NYSDOT - Region 8: Construction, bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) lane shift until 11:59 P.M. on December 19, 2025 D265160/B1026780/32112309 Mon, 10 Mar 2025 05:59:11 -0400 41.5130253486982 -74.0492785615146 NY 126 both directions : Construction NYSDOT - Region 7: Construction on NY 126 both directions (Wilna) All lanes open until 11:59 November 30, 2025 Signal Replacement at Intersection of NY Route 126 and N. Mechanic Street Tue, 03 Dec 2024 09:58:05 -0500 43.9778987922716 -75.6096251086944 936E; I-81 NB Service Road northbound : Construction NYSDOT - Region 3: Construction , roadwork on 936E; I-81 NB Service Road northbound ramp to Exit 23 - NY 370 East; Park Street (Syracuse) All lanes closed until 11:59 PM on December 31,2025 closed until further notice Tue, 14 Jan 2025 08:58:06 -0500 43.069102 -76.167311 US 9W southbound : Construction NYSDOT - Region 8: Construction, utility work on US 9W southbound between Short Clove Road (Haverstraw) and NY 304 (Haverstraw) shoulder closed until 4:00 P.M. on December 19, 2025 202308107656/32258309 - Plan travel accordingly; delays may exist Wed, 28 May 2025 18:44:49 -0400 41.1821711751389 -73.9549292922414 I-81 northbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 northbound under South Bay Road; CR 208 (Cicero) All lanes of 3 lanes open until 6:00 AM on March 28,2026 ; Alternating lane closures Fri, 28 Feb 2025 14:52:04 -0500 43.149772 -76.109967 GARDEN RD both directions : Construction NYSDOT - Region 7: Construction , bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) All lanes closed until 11:59 PM on December 31,2025 Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice Wed, 09 Oct 2024 15:42:05 -0400 44.1589685052784 -75.7085867284068 I-81 southbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 southbound under South Bay Road; CR 208 (Cicero) All lanes of 3 lanes open until 6:00 AM on March 28,2026 ; Alternating lane closures Fri, 28 Feb 2025 14:54:05 -0500 43.149574 -76.110251 I-81 northbound : Construction NYSDOT - Region 3: Construction , bridge demolition on I-81 northbound under South Bay Road; CR 208 (Cicero) All lanes of 3 lanes open until 6:00 AM on March 28,2026 ; Alternating lane closures Fri, 28 Feb 2025 14:53:06 -0500 43.149772 -76.109967 BRIDGE ST (NY Route 971H over Black River bridge) westbound : Construction NYSDOT - Region 7: Construction on BRIDGE ST (NY Route 971H over Black River bridge) westbound (Brownville) All lanes closed 5:00 P.M. October 31, 2025 Bridge Closed Fri, 03 Jan 2025 09:31:52 -0500 44.0009857540704 -75.9813942752446 BRIDGE ST (NY 970H over Black River) eastbound : Construction NYSDOT - Region 7: Construction on BRIDGE ST (NY 970H over Black River) eastbound (Hounsfield) to at (Brownville) All lanes closed until 11:59 October 31, 2025 Bridge Closed Fri, 03 Jan 2025 09:33:53 -0500 43.999567770006 -75.9820552677776 Bridge Street Interstate bridge # 7 westbound : Roadwork NYSDOT - Region 9: Roadwork on Bridge Street Interstate bridge # 7 westbound (Callicoon) 1 westbound one lane of 2 lanes blocked for bridge rehabilitation to occur from 3/24/25 through 11/30/25 during the hours of 6:00 AM to 5:30 PM. This work is weather dependent with no flagger personnel present. Traffic will be controlled by temporary signal. Started Open Reach. IR# 6256091 D265033 Wed, 06 Aug 2025 10:26:45 -0400 41.7650010366706 -75.0609952667757 I-81 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-81 southbound at Exit 16A - ramp to I-481 NB (Syracuse) All lanes closed until 3:00 PM on December 31,2025 ; follow detour Thu, 21 Dec 2023 07:33:04 -0500 43.0093816184579 -76.1359687860938 NY 12F westbound : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12F westbound (Hounsfield) All lanes of 1 lane open until 11:59 PM on October 31,2025 Fri, 26 Apr 2024 10:38:05 -0400 43.9986040283861 -75.9881256176634 NY 12F eastbound : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12F eastbound (Hounsfield) All lanes of 1 lane open until 11:59 PM on October 31,2025 Fri, 26 Apr 2024 10:34:04 -0400 43.9983145281957 -76.0031599770027 I-88 both directions : Roadwork NYSDOT - Region 9: Roadwork on I-88 both directions between Exit 8 - NY 206; Ramp (Bainbridge) and Exit 7 - I-88 (Exit 7) connector to NY 41 (Afton) 2 left lane of 4 lanes blocked for bridge repair to occur from 12/11/24 through 8/31/25 with closure remaining in place for duration of repair work (including over night). This work is not weather dependent with no flagger personnel present. Started Open Reach. IR# 6867091 D265120 Wed, 06 Aug 2025 13:21:54 -0400 42.2853012084961 -75.4731979370117 NY 17 [Tioga] both directions : Roadwork NYSDOT - Region 9: Roadwork on NY 17 [Tioga] both directions between Exit 65 - NY 434; Ramp (Owego) and Town of Owego; Town of Vestal Line (Owego) 1 alternate lanes of 2 lanes blocked for preparations for upcoming construction to occur from 03/20 through 11/01 during the hours of 7:00AM and 5:00PM. New striping will be placed on NY 17 EB allowing traffic to only use the right lane. Starting 3/22 a temporary concrete barrier will be placed in EB following the new striping patterns. On 4/01 head to head traffic will be in place with a single lane for WB and EB all on the EB side of the highway and the contractor will CLOSE Exit 66 WB off ramp to traffic. A signed detour will be in place taking WB traffic to Exit 65 and getting them onto NY 17 EB and back to Exit 66. The ramp to get on NY 17 WB from Exit 66 will remain open. There will be no flag personnel present and this work is weather dependent. Started Open Reach. IR#4948091 D265091 Tue, 25 Jun 2024 13:19:54 -0400 42.0886001586914 -76.2288970947265 Inner Port Street both directions : Construction Port Authority NY/NJ: Construction on Inner Port Street both directions between Corbin Street (Newark) and Port Street (Newark) All lanes closed until September 2025 Mon, 07 Jul 2025 12:26:29 -0400 40.7040488538158 -74.1505620476053 I-481 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 southbound ramp to Exit 9N; I-81 N (Cicero) All lanes closed until 3:00 PM on December 31,2025 ; follow detour Thu, 02 Jan 2025 11:42:04 -0500 43.1413987884337 -76.1121711315659 I-86 eastbound : Construction NITTEC: Construction , bridge work on I-86 eastbound Exit ramp to Exit 9 closed. Use Exit 10. (Ellery) All lanes closed until 11:59 PM on December 31,2026 Wed, 03 Apr 2024 10:13:04 -0400 42.152016 -79.382971 VAN HOESEN RD both directions : Construction NYSDOT TMC - Albany: Construction on VAN HOESEN RD both directions under I-90 (Schodack) right shoulder closed until 5:00 PM on November 15,2025 Wed, 05 Mar 2025 09:34:20 -0500 42.5196847164031 -73.6886492539533 NY 12E northbound : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12E northbound Village of Brownville; Town of Brownville (Brownville) to Village of Brownville; Town of Brownville (Brownville) All lanes of 1 lane open until 11:59 PM on October 31,2025 Fri, 26 Apr 2024 13:05:05 -0400 44.0017026863694 -75.992319226293 Gillett Rd, CR-210 both directions : Construction NYSDOT - Region 4: Construction , bridge replacement on Gillett Rd, CR-210 both directions over CSX rail bed (Ogden) All lanes closed until 11:59 PM on December 31,2029 BRIDGE CLOSED, detours are posted at Big Ridge Rd and Rt 31. Road open beyond detour signs to local traffic only. Mon, 09 Sep 2024 13:38:04 -0400 43.1885857129676 -77.773587389208 US 11 both directions : Construction NYSDOT - Region 7: Construction , construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) All lanes of 1 lane open until 11:59 PM on December 31,2027 Narrow Bridge Sun, 15 Dec 2024 21:00:05 -0500 44.7720819404316 -74.713616527616 NY 240 both directions : Construction NITTEC: Construction, construction on NY 240 both directions Westbrook Drive (Cheektowaga) to Maryvale Drive (Cheektowaga) 1 Left lane of 2 lanes closed Tue, 12 Nov 2024 18:46:02 -0500 42.9336719270712 -78.7841518738921 Atlantic City Expressway eastbound : Construction South Jersey Transp. Auth.: Construction, construction on Atlantic City Expressway eastbound between West of Egg Harbor Toll Plaza (Hamilton Twp) and Egg Harbor Toll Plaza (Hamilton Twp) right shoulder closed MOVE OVER FOR HIGHWAY WORKERS Sat, 21 Dec 2024 10:10:17 -0500 39.5159187348148 -74.6901104895261 RIVERVIEW RD both directions : Construction NYSDOT TMC - Albany: Construction on RIVERVIEW RD both directions CLAM STEAM RD and BOYACK RD (Halfmoon) All lanes open until 11:59 PM on December 19,2025 alternating lanes closed controlled by traffic signals Wed, 05 Mar 2025 09:34:27 -0500 42.8004478849381 -73.7648774716053 NY 298 both directions : Construction NYSDOT - Region 3: Construction , bridge rehabilitation on NY 298 both directions between Solar Street (Syracuse) and Sunset Avenue (Syracuse) All lanes closed until 3:00 PM on November 03,2025 Fri, 01 Nov 2024 07:00:06 -0400 43.0642807658309 -76.1661655334147 I-80 eastbound : Construction NJ DOT - STMC: Construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) All lanes closed **Exit 56B Ramp only** until 3:00 PM on November 18, 2025 Thu, 05 Dec 2024 12:02:07 -0500 40.904098 -74.193024 NY 12E southbound : Construction NYSDOT - Region 7: Construction , bridge replacement on NY 12E southbound Village of Brownville; Town of Brownville (Brownville) to Village of Brownville; Town of Brownville (Brownville) All lanes of 1 lane open until 11:59 PM on October 31,2025 Mon, 18 Nov 2024 15:44:04 -0500 44.0018780113039 -76.0002304655625 NJ 70 both directions : Construction NJ DOT - TOC South: Construction on NJ 70 both directions between East of Cropwell Rd (Evesham Twp) and NJ 38 (Pennsauken Twp) All lanes shift until 11:00 P.M.on November 30th, 2025 Tue, 29 Apr 2025 04:01:19 -0400 39.8947855183852 -74.9336453272234 Atlantic City Expressway westbound : Construction South Jersey Transp. Auth.: Construction on Atlantic City Expressway westbound between East of Exit 5 - US 9 (Pleasantville) and West of Exit 5 - US 9 (Egg Harbor Twp) 1 Right lane and shoulder of 3 lanes closed MOVE OVER FOR HIGHWAY WORKERS Tue, 15 Apr 2025 07:40:05 -0400 39.4019128160854 -74.5237303304474 I-87 Northway both directions : Construction NYSDOT TMC - Albany: Construction, bridge work on I-87 Northway both directions Exit 7; NY 7 (Colonie) left shoulder of 3 lanes closed northbound until 11:59 PM on September 30,2025; southbound Thu, 05 Jun 2025 23:59:10 -0400 42.7627893479892 -73.762532508311 I-481 southbound : Construction NYSDOT - Region 3: Construction , longterm construction on I-481 southbound ramp to I-81 soutbound (Syracuse) All lanes closed until 3:00 PM on December 31,2025 ; follow detour Mon, 25 Sep 2023 09:00:08 -0400 43.007882 -76.1307105 NY 33A westbound : Construction NYSDOT - Region 4: Construction , bridge work on NY 33A westbound over Erie Canal (Rochester) 1 Right lane of 2 lanes closed until 11:59 PM on December 31,2025 Tue, 31 Dec 2024 06:18:04 -0500 43.1402832232763 -77.6657956524986 NJ 47 both directions : Construction NJ DOT - TOC South: Construction on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) 1 Right lane of 2 lanes closed until 11:59 PM on December 31,2025 Tue, 29 Apr 2025 04:00:53 -0400 39.870341 -75.125527 NY 3 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) to Route 3 - Arsenal Street at North Meadow Street (Watertown) All lanes of 2 lanes open until 11:59 PM on November 30,2025 Signal Replacement Tue, 03 Dec 2024 09:57:04 -0500 43.97639096423 -75.9206566174228 NY 26 both directions : Construction NYSDOT - Region 7: Construction , intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) All lanes of 2 lanes open until 11:59 PM on November 30,2025 Signal Replacement Tue, 03 Dec 2024 09:54:03 -0500 43.7882979619324 -75.493499612246 Port Street eastbound : Construction Port Authority NY/NJ: Construction on Port Street eastbound ramp to Corbin Street (Newark) All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025 Sun, 06 Apr 2025 08:57:27 -0400 40.7047103800473 -74.1514923040378