GWB Structural Steel Deck Rehabilitation
Travel Advisory
I-95 North from I-80 to the Alexander Hamilton Br via Upper (6 mi.)Unavail.
I-95 North from I-80 to the Alexander Hamilton Br via Lower (6 mi.):43
NJ 4 East from Fort Lee to the Alexander Hamilton Br via Upper (4 mi.):32+
NJ 4 East from Fort Lee to the Alexander Hamilton Br via Lower (4 mi.):36
US 46 from Fort Lee to the Alexander Hamilton Br via Lower (4 mi.):35
Cross Bronx Expy West from Jerome Ave to I-80 via Upper (6 mi.):08
Cross Bronx Expy West from Jerome Ave to I-80 via Lower (6 mi.):08
Henry Hudson Pky North from 96th St to I-80 via Upper (9 mi.):12
Henry Hudson Pky North from 96th St to I-80 via Lower (9 mi.):13
Harlem River Dr North from RFK Triborough Br to I-80 via Upper (9 mi.):11
Harlem River Dr North from RFK Triborugh Br to I-80 via Lower (9 mi.):11
Major Deegan Expy North from RFK Triborough Br to I-80 via Upper (9 mi.):12
Major Deegan Expy North from RFK Triborough Br to I-80 via Lower (9 mi.):12
Major Deegan Expy South from W.230th St to I-80 via Lower (9 mi.):11
Major Deegan Expy South from W.230th St to I-80 via Upper (9 mi.):11
Current Incidents
As of 6:24am, there's a Rough road on I-87 Major Deegan Expressway northbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway in New York. All lanes open use caution.
As of 11:30pm, there are Delays on the George Washington Bridge eastbound between New Jersey Side/Upper Level Toll Plaza in Fort Lee and New York Side/Upper Level in Manhattan 35 minute delays.
As of 11:37pm, there's Construction on the New Jersey Turnpike express lanes northbound from Northern Mixing Bowl in Ridgefield to George Washington Bridge in Fort Lee. All lanes closed until 5:00 A.M.
As of 11:27pm, there's Construction on I-95 northbound between Undercliff Avenue and Exit 4A - I-895; Sheridan Expressway in New York. Left and center lanes closed from 11:30 P.M. until 5:00 A.M.
As of 11:25pm, there's Construction on I-80 local lanes eastbound at Exit 68 - New Jersey Turnpike/I-95 in Teaneck Twp. Right lane closed for repairs until 6:00 A.M.
As of 10:00pm, there's Construction on US 9W northbound ramp to northbound Palisades Interstate Parkway in Fort Lee. Ramp closed and detoured until 5:30 A.M.
As of 9:15pm, there's Construction on Fort Washington Avenue southbound between West 168th Street and West 159th Street. All lanes closed from 9:00 P.M. until 5:00 A.M.
As of 9:04pm, there's Construction on the George Washington Bridge eastbound from New Jersey Side/Upper Level in Fort Lee to New York Side/Upper Level in Manhattan. 1 lane open to traffic until 5:00 A.M., Passenger vehicles: Use lower level to avoid delays. Will accept cash/E-zpass.
As of 9:03pm, there's Construction on the George Washington Bridge eastbound ramp from Palisades Interstate Parkway Toll Plaza in Fort Lee. closed until 5:00 A.M.
As of 8:35pm, there's Construction on the Palisades Interstate Parkway northbound between George Washington Bridge in Fort Lee and Exit 1 - Palisade Avenue in Englewood Cliffs until 5:30 A.M., left lane closed. Plus expect temporary closure of Fort Lee Fletcher Avenue and Lemoine Avenue on ramps.
As of 8:30pm, there's Construction on the Palisades Interstate Parkway northbound North of George Washington Bridge in Fort Lee. Left lane closed for repairs until 5:30 A.M.
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB22X]