GWB Structural Steel Deck Rehabilitation
Travel Advisory
I-95 North from I-80 to the Alexander Hamilton Br via Upper (6 mi.):09
I-95 North from I-80 to the Alexander Hamilton Br via Lower (6 mi.):10
NJ 4 East from Fort Lee to the Alexander Hamilton Br via Upper (4 mi.):06
NJ 4 East from Fort Lee to the Alexander Hamilton Br via Lower (4 mi.):07
US 46 from Fort Lee to the Alexander Hamilton Br via Lower (4 mi.):09
Cross Bronx Expy West from Jerome Ave to I-80 via Upper (6 mi.):13
Cross Bronx Expy West from Jerome Ave to I-80 via Lower (6 mi.):15
Henry Hudson Pky North from 96th St to I-80 via Upper (9 mi.):12
Henry Hudson Pky North from 96th St to I-80 via Lower (9 mi.):13
Harlem River Dr North from RFK Triborough Br to I-80 via Upper (9 mi.):13
Harlem River Dr North from RFK Triborugh Br to I-80 via Lower (9 mi.):15
Major Deegan Expy North from RFK Triborough Br to I-80 via Upper (9 mi.):23
Major Deegan Expy North from RFK Triborough Br to I-80 via Lower (9 mi.):24
Major Deegan Expy South from W.230th St to I-80 via Lower (9 mi.):30
Major Deegan Expy South from W.230th St to I-80 via Upper (9 mi.):28
Current Incidents
As of 6:34am, there's a Rough road on I-87 Major Deegan Expressway northbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway in New York. All lanes open use caution.
As of 10:38am, there are Delays on I-95 northbound between Exit 1C - Major Deegan Expressway; Alexander Hamilton Bridge and 3rd Avenue; Exit 3 in New York.
As of 10:49am, there's Construction on NJ 4 in both directions at Jones Rd in Englewood. 1 lane closed until 3:00 P.M., 5-10 minute delay.
As of 10:42am, there's Construction on I-87 Major Deegan Expressway southbound ramp to Exit 7N-7S 7N & - I-95-Cross Bronx Expressway in New York. Left lane closed until further notice.
As of 10:29am, there's Construction on I-87 Major Deegan Expressway southbound between Macombs Dam Bridge and East 138th Street; Ramp in New York. Right lane closed until 3:00 P.M.
As of 9:47am, there's Construction on the George Washington Bridge eastbound between New Jersey Side/Lower Level in Fort Lee and New York Side/Lower Level in Manhattan. Right lane blocked until apaproximately 3:00 P.M.
As of 9:21am, there's Construction on the Broadway Bridge - US 9 northbound. Right lane closed until 2:00 P.M.
As of 9:14am, there's Construction on Harlem River Drive southbound area of I-95 Cross Bronx Expressway in New York. Right lane closed until 2:00 P.M.
As of 9:01am, there's Construction on US 9W southbound in the vicinity of Bayview Av in Englewood Cliffs. Right lane closed for repairs until 12:00 P.M.
As of 8:35am, there's Construction on the George Washington Bridge westbound between New York Side/Lower Level in Manhattan and New Jersey Side/Lower Level in Fort Lee. Right lane closed until approximately 3:00 P.M.
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB21X]