Mega Projects*
511NJ Twitter
Pulaski Skyway Project*
Transit Trip Planner
New Jersey Transit Trip Planner
Powered by Google

Start (e.g. Newark Liberty Airport)

End (e.g. Statue of Liberty)

  or
  
Port Authority of NY&NJ
Severity Alert
Until 10 PM tonight Saturday March 25th, I-295 Southbound Exit 67 ramps to Route 1 Northbound and Southbound in Lawrence Township will be closed for ongoing construction. A posted detour will be in effect, motorists are urged to allow extra travel time.
Starting Wednesday March 29th 2017 through April 5th 2017, Route 206 in both directions between Lovers Lane and Carter Road in Princeton, Mercer County. All lanes will be closed and detoured between the hours of 9 AM to 3 PM due to a Utility relocation being done in advance of rehabilitation of Route 206 Bridges over Stony Brook. Motorist's are advised to seek alternate routes to avoid delays.
There is a double lane closure of Route 440 NB in Jersey City between W 63rd Street and Clendenny Ave for utility work. Motorists should use caution. Daily closures are expected to last through April.
DRJTBC: Toll lane repairs on I-78 Toll Bridge westbound at Pennsylvania Side - Toll Plaza (Easton) far right toll lane closed for construction work. Wide loads must use Express EZ-Pass Lanes during this period., Continuous 7 PM, Sunday March 19th, 2017 thru Noon, Saturday March 25th.
Popular Travel Routes*

Driving times for...

GW Bridge to Interchange 18W via express lanes (9mi.):10
GW Bridge to Interchange 18W via local lanes (9mi.):10
Int 18W to Int 14 (7mi.):08
Int 14 to Int 8A (32mi.):31
Int 8A to Int 6 (22mi.):20
Int 6 to Int 1 (50mi.):47
Interactive Map
Cameras
SafeTripNJ
Current Incidents
Checked Counties:
select
As of 11:00pm, there's Construction on NJ 495 westbound from Lincoln Tunnel in Weehawken Twp to New Jersey Turnpike in Secaucus. Up to 2 lanes closed from 11:00 P.M. until 5:00 A.M.
As of 5:22am, there's Construction on NJ 20 northbound at Fairlawn Av Bridge in Paterson. Right turn lane closed for repairs until 11:00 P.M. on May 29, 2017.
As of 5:21am, there's Construction on US 1&9 Truck Route northbound ramp to New Jersey Turnpike in Newark. Ramp closed for repairs until further notice.
As of 5:21am, there's Construction on Pulaski Skyway northbound between US 1&9 Truck Route/Raymond Blvd in Newark and US 1&9 Truck Route/I-280/NJ 7 in Jersey City. All lanes closed and detoured until further notice.
As of 5:21am, there's Construction on Pulaski Skyway in both directions ramp to/from Broadway in Jersey City. Ramp closed and detoured until further notice.
As of 5:21am, there's Construction on NJ 35 southbound NJ 440 Connector in Perth Amboy. Right lane closed for repairs until further notice.
As of 5:20am, there's Roadwork on NJ 139 Upper eastbound between Summit Ave and Palisades Av in Jersey City. 1 lane closed for repairs until further notice.
As of 5:00am, there's Construction on NJ 18 in both directions between North of Exit 30 - US 9 in Old Bridge Twp and South of NJ 138 in Wall Twp. Moving operation until 12:00 P.M.
As of 5:00am, there's Construction on US 9 southbound from NJ 52 to Garden State Parkway in Somers Point. Moving operation until 1:00 P.M.
As of 1:24am, there's Construction on Sinatra Drive North northbound between 14th Street and Shipyard Lane, and 14th Street westbound between Shipyard Lane and Sinatra Drive North in Hoboken. All lanes closed and detoured until 5:00 P.M. on July 28, 2017.
As of 12:26am, there's Construction at the Lincoln Tunnel eastbound from New Jersey Side - South Tube in Weehawken Twp to New York Side - South Tube in Manhattan. All lanes closed until 8:00 A.M.
As of 12:19am, there's Construction on the Bayonne Bridge in both directions from New Jersey Side in Bayonne to New York Side in Staten Island. All lanes closed until 8:00 A.M.
As of 12:00am, there's Construction on NJ 139 Lower in both directions between New Jersey Turnpike/NJ 139 Split and Tonnelle Avenue in Jersey City. All lanes closed and detoured until 11:00 A.M.
As of 11:47pm, there's Construction on the George Washington Bridge eastbound ramp from New York Side/Lower Level in Manhattan. Right lane closed for repairs until 8:00 A.M., to Henry Hudson Parkway.
As of 11:46pm, there's Construction on the George Washington Bridge westbound from New York Side/Upper Level in Manhattan to New Jersey Side/Upper Level in Fort Lee. 2 left lanes blocked until 8:00 A.M.
As of 11:26pm, there's Construction on the George Washington Bridge westbound from Harlem River Drive to Henry Hudson Parkway in Manhattan. 2 left lanes closed for repairs until 8:00 A.M., lower Trans Manhattan Expressway.
As of 10:55pm, there's Construction on the Garden State Parkway southbound from Essex Toll Plaza to North of Exit 148 - John F Kennedy Dr North in Bloomfield. Right and center lanes closed for repairs from 11:00 P.M. until 3:00 P.M.
As of 10:19pm, there's Construction on I-280 westbound between West of CR 508 in Kearny and East of Exit 15 - NJ 21 in Newark. 1 to 2 lanes closed until 6:00 A.M.
As of 10:00pm, there's Construction on US 1&9 local and express roadways in both directions area of I-78 in Newark. 1 lane closed for repairs until 7:30 A.M.
As of 10:00pm, there's Construction on Pulaski Skyway southbound between Tonnelle Circle in Jersey City and US 1&9 Truck Route/Raymond Blvd in Newark. 1 lane closed for repairs until 6:00 A.M.
As of 9:00pm, there's Construction on NJ 27 northbound Van Dyke Av in New Brunswick. Traffic shift until 6:00 A.M.
As of 9:00pm, there's Construction on NJ 27 northbound North of Talmadge Rd in Edison Twp. Traffic shift until 6:00 A.M.
As of 8:00pm, there's Construction on NJ 35 northbound North of CR 547/Wyckoff Rd in Eatontown. 1 lane closed until 6:00 A.M.
As of 8:00pm, there's Construction on NJ 21 in both directions between CR 508/Bridge St and Clay St/Mount Pleasant Av in Newark. Various lanes closed for repairs until 6:00 A.M.
As of 7:07pm, there's Construction on Port Newark Elizabeth Marine Terminal. Right and center lanes closed until 6:00 P.M., McLester Street southbound between Tripoli Street and Polaris Street.
As of 7:00pm, there's Construction on US 40 in both directions at Garden State Parkway in Egg Harbor Twp. 1 lane closed until 3:30 P.M., use caution.
As of 5:24pm, there's Construction on Sunrise Avenue in both directions from Bridge Avenue to Shadey Glen Avenue in Point Pleasant. All lanes closed . Starting from Monday March 27th 2017, Motorists should allow extra time use alternate route.
As of 12:19pm, there's Construction on NJ 42 in both directions between Exit 12 - CR 544/Clements Bridge Rd in Deptford Twp and I-295 in Bellmawr. Traffic shift until 11:59 P.M. on July 31, 2017.
As of 12:19pm, there's Construction on US 30 in both directions between East of NJ 143/Spring Garden Rd and CR 723/Fleming Pike in Winslow Twp. Traffic shift until 11:59 P.M. on September 30, 2017, use caution.
As of 12:18pm, there's Construction on NJ 36 northbound North of Beach Rd in Monmouth Beach. Traffic shift until 7:00 A.M. on April 30, 2017.
As of 12:18pm, there's Construction on NJ 37 eastbound approaching Mathis Bridge-Eastbound in Toms River Twp. Traffic shift until May 15, 2017, all lanes closed and shifted to Tunney Bridge.
As of 12:17pm, there's Construction on US 1 in both directions between South of South Broad St and North of Perry St in Trenton. Left lane closed until 1:00 A.M. on March 25, 2017, use caution.
As of 12:17pm, there's Construction on I-76 in both directions between Exit 1A - NJ 42/I-295 in Bellmawr and Exit 1C - CR 634/Market St in Gloucester City. Traffic shift until 11:59 P.M. on August 29, 2017, use caution.
As of 12:16pm, there's Construction on I-295 in both directions between Exit 26N - I-76/I-676 and Exit 28 - NJ 168/Black Horse Pike in Bellmawr. Traffic shift until 11:59 P.M. on March 29, 2017, use caution.
As of 12:16pm, there's Construction on NJ 50 in both directions in the vicinity of NJ 49 in Upper Twp. Alternate lanes closed intermittently until 11:59 P.M. on June 1, 2017, use caution.
As of 12:15pm, there's Construction on NJ 72 in both directions in the vicinity of Shore Av in Stafford Twp. Left lane closed until 11:59 P.M. on March 31, 2017.
As of 12:14pm, there's Construction on US 130 in both directions between South of US 322 and South of NJ 44 in Logan Twp. 1 lane closed until further notice, use caution.
As of 12:14pm, there's Construction on I-295 southbound Exit 67 - US 1 in Lawrence Twp. Ramp closed and detoured until 7:00 A.M. on March 31, 2017, ramp to Route 1 southbound.
As of 7:00pm, there's Construction on the I-78 Toll Bridge westbound Pennsylvania Side - Toll Plaza in Easton. 1 toll lane closed for repairs until 12:01 P.M. on March 25, 2017, Far right lane at toll plaza closed for construction work. Wide loads must use Express E-ZPass facility during this period.
As of 5:33am, there's Construction on Newark Liberty International Airport :Eastbound Basilone Road between South Directory Road and Earhart Drive is closed until October 2017. Westbound will remain open.
As of 5:04am, there's Construction on John F. Kennedy International Airport . Traffic detours in effect due to construction by Terminal 5. Allow extra travel time when picking up or dropping off passengers, or utilize AirTrain.
As of 6:15am, there's Construction on the Bayonne Bridge in both directions from New Jersey Side in Bayonne to New York Side - Toll Plaza in Staten Island. 1 lane open until Mid 2019., There is a 25 mile per hour speed restriction in effect.
As of 7:27am, there's Construction on La Guardia Airport Lot P3 - CLOSED in New York until 11:59 P.M. on June 07, 2017, is closed permanently. Use lots P 2, P 4 and P 5. Free shuttle service is available to terminals and parking lots. Allow extra time.
As of 8:05am, there's Operational Activity on Global Terminal . Global Container Terminal Bayonne will be open Sunday March 26th from 6 A M to 1 P M. No reefers or Out Of Gauge will be handled. Truck reservations are mandatory between 6 A M and 9 A M.
View All New Jersey Events
Safety Message
Weather
*Disclaimer: Traffic information is subject to change at any time.
+ - portions based on historical data.
Travel Times are displayed in HH:MM format.
This page auto-refreshes every 2 minutes.
[ICX1-WEB11X]